![C14764 Foundation Park Building 1 PP 200223 _0030_1.0final.jpg](/sites/vw_uk_fitzpatrick/files/styles/content_keyvisual_parallax_large_xsmall/public/webcomposer/9214--C14764%20Foundation%20Park%20Building%201%20PP%20200223%20_0030_1.0final.jpg?h=74328444&itok=HfIFbyeu)
Foundation Park, Building 1
VolkerFitzpatrick to design and build new office for JP Morgan, situated in Foundation Park, Building 1, Maidenhead, Berkshire
- Design and build contract for a new three-storey, 57,000 sq. ft, with Cat A fit out
- Cable-supported ‘floating’ staircase in three-storey atrium reception
- Rooftop Terrace
- Pile cap foundations, steel frame, in-situ reinforced concrete upper floors
- Two single, precast lift shafts are being installed on the site.
- Façade includes glazed curtain walling and alternating feature panels
- Acoustic raft ceiling panels and exposed services
- The site will also accommodate a external parking, hard & soft landscaping.
- LED lighting and EPC ‘A’ rating