New Headquarters Stryker Pharmaceuticals, Newbury
This project involved the single stage design and build of a three storey, 110,000ft² head office building for Stryker Pharmaceuticals, built to BREEAM ‘Excellent' standard, including all category A and B fit-out works. Category B fit-out included all furniture, racking, workstations, kitchen equipment, reception desk and audio visual equipment.
VolkerFitzpatrick also co-ordinated the client's ICT requirements, providing early access to their ICT contractor and worked closely with the client and architect to develop practical design details from the initial visual concepts. We did this through extensive consultation, providing samples, options, room mock-ups and visits to manufacturers. Our specialist sub-contractors also provided valuable advice through their early involvement.
VolkerFitzpatrick also successfully co-ordinated the numerous envelope components, requiring 28 design meetings involving the four different envelope sub-contractors, the architect and our project manager.
Construction included CFA piles, steel frame with metal decking and in-situ concrete upper floors. The roof comprised of single ply membrane, asphalt and air pressurised ETFE panels. Internals included dry lined partitions, raised access floors, suspended ceilings and full M&E services with comfort cooling. Sustainable features included biomass boiler, solar panelling, rainwater harvesting and intelligent BMS controls.